ParticipantAnyone have a clue what’s going on there? Must be under “reconstruction” for over 18 months now.
Hardly needed that much of a refurb?18/07/2025 at 1:34 pm #1308TheBeerNut
Keymaster“Change of use of first and second floors of existing licenced premises from existing bar/lounge area (at first floor) and existing storage rooms & ancillary accommodation (at second floor) to new guest accommodation to provide 7 no. guest bedrooms with ensuite bathrooms at first floor & 6 no. guest bedrooms with ensuite bathrooms at second floor (total 13 guest bedrooms) & ancillary storage accommodation. To include material alterations to facilitate works inc. new accommodation/escape stairs, remodelled entrance lobby at ground floor, and associated internal layout changes & external alterations, inc. alterations to fenestration, alterations to roof, removal of redundant services & chimneys etc.”
Planning reference 5059/23.“Development will consist of alternations to previously permitted development permission ref. 5059/23 to comprise of flat roof extension to rear of second floor level and alterations to previously permitted 2nd floor layout to provide 2 additional ensuite guest bedrooms to 2nd floor, increasing 2nd floor bedrooms from 6 bedrooms to 8 bedrooms (total of 15 no. Bedrooms in overall development), to include all associated material internal and external alterations to facilitate works as indicated on drawings.”
Planning reference WEB2313/2418/07/2025 at 1:56 pm #1310baconsarnie
ParticipantCheers TBN.
I cycle past it regularly and not much seems to be happening.
18/07/2025 at 1:57 pm #1312TheBeerNut
KeymasterWork is definitely ongoing. The street-level hoardings are new and the windows were changed recently.
14/11/2025 at 5:47 pm #1420Cian Duffy
ParticipantReplacement Libertine Lounge And Lodgings is hiring now. I hold out little hope for the beer selection
-